Heavy-duty Braided Fast Charge Phone Charger C Type C Data Cable Lead 1m, 2m & 3m
Fast Charge and Data Transfer: Type C Charging Cable Tinned copper wires inside and lower resistance value ensure a maximum current
2.4A and transfer data up to 480Mb/s 10% faster than most other standard Type C cables. Save your time and protect your devices.
Case Friendly: Aluminium - Connectors android charger cable connector Anti oxidation, Anti-rust, fit most cases without any hassle.
Durable Performance: Type C cable is covered with strong & sturdy braided nylon jacket, material, nylon fibre has the feature of anti-aging,
anti-twisting and moisture protection. The well-built aluminium connector resists heat and corrosion, it won't get loose or cause any charging issue.
Package include:
1 x Charging Cable